10 YEARS FACTORY EXPERIENCE, SUPPORT OEM & ODM, CONTACT E-MAIL:CLARK@SIAS-ENERGY.COM, WHATSAPP:0086-15937123163

50KW/100KWH Commercial & Industrial Energy Storage System GCB-E100

50KW/100KWH Commercial & Industrial Energy Storage System GCB-E100

Regular price
$22,000.00
Sale price
$22,000.00
Regular price
Sold out
Unit price
per 

[GCB-E100: ALL-IN-ONE 50KW/100KWH C&I BESS]

50kW AC / 100.35kWh nominal (up to 112.53kWh usable). Battery modules + BMS + EMS + HVAC + FSS in single IP54 cabinet (~1200x803x2375mm, ~1300kg). Grade A 280Ah or 314Ah LFP prismatic cells, 6,000+ cycles at 80% DOD. 50kW three-phase 380V inverter. Three modes: Grid-tied / Off-grid / Hybrid. Factory pre-commissioned. CE, RoHS, ISO9001, IEC 62619, UL 1973. 5-year warranty. Configurable to siteGCB-E100 Commercial & Industrial Energy Storage System

A factory-integrated 50kW/100kWh all-in-one BESS cabinet combining battery modules, BMS, EMS, HVAC, and fire suppression system in a single IP54 enclosure. Engineered for peak shaving, solar self-consumption, backup power, TOU arbitrage, and microgrid applications. Every system is configured to site requirements — capacity, operating mode, protection design, and integration interfaces are confirmed per project.

Key Specifications at a Glance

• AC Power: 50kW — Three-Phase 380V AC• Nominal Capacity: 100.35kWh (up to 112.53kWh Usable)• Battery Cells: Grade A LFP — 280Ah / 314Ah Options• Cycle Life: 6,000+ at 25°C, 0.5C, 80% DOD• Architecture: All-in-One — BESS + BMS + EMS + HVAC + FSS• Enclosure: IP54 — ~1200×803×2375mm — ~1300kg• Operating Modes: Grid-Tied / Off-Grid / Hybrid (Configurable)• Cell Certification: IEC 62619 / UL 1973• Certifications: CE / RoHS / ISO9001 / ISO14001• Warranty: 5 Years Standard

 

PROJECT-FOCUSED ENERGY STORAGE DESIGN

Integrated All-in-One CabinetFactory-assembled enclosure combines battery modules, PCS, BMS, EMS, HVAC and fire suppression — reducing on-site coordination, wiring, and commissioning time vs separate-component systems.

Grid & Backup PlanningChoose grid-tied (peak shaving, TOU, demand management), off-grid (islanded backup), or hybrid (solar-plus-storage) mode — configured to your load profile, tariff structure, and utility interconnection rules.

Engineering Before DeliveryConfirm installation space, cable routes, local codes, fire strategy, ambient conditions, and commissioning scope before order. We provides a complete technical proposal within 2–3 business days.

REFERENCE CONFIGURATION & TECHNICAL DATA

The following figures are reference information. Final configuration, compliance documents, and installation conditions are confirmed per project. All parameters configurable to site requirements.

System Reference

Specification

AC Power & Capacity

50kW / 100.35kWh nominal (up to 112.53kWh usable) — AC-coupled reference configuration.

Battery Cells

Grade A LFP prismatic cells — 280Ah / 314Ah reference options per project requirement.

Cycle Life

6,000+ cycles at 25°C, 0.5C charge/discharge, 80% DOD reference conditions.

AC Interface

50kW three-phase four-wire 380V AC inverter. On-grid, off-grid, and hybrid operation require project validation.

Integrated Subsystems

BMS (cell-level monitoring), EMS (energy management), HVAC (thermal control), FSS (fire suppression) — all factory-integrated.

Enclosure

IP54 — approx. 1200×803×2375mm — approx. 1300kg. Verify access, foundation, and lifting before order.

 

HOW TO SELECT THE RIGHT C&I ENERGY STORAGE SYSTEM

Project Input

Why It Matters

Load Profile & Tariff

Defines power, usable energy, and expected value of peak reduction or energy shifting.

Solar & Utility Connection

Determines AC coupling topology, grid connection conditions, export policy, and operating controls.

Backup Loads & Duration

Separates essential from non-critical loads for a realistic resilience design.

Site & Compliance Review

Confirms indoor/outdoor placement, ventilation, clearances, local approvals, and safety requirements.

 

PROJECT APPLICATIONS

FactoriesPeak shaving, load management, and essential-process backup.

Commercial BuildingsDemand charge reduction for offices, retail, and campuses.

Solar + StorageMaximize PV self-consumption and dispatch planning.

EV Charging HubsBuffer charging peaks and reduce grid upgrade costs.

FREQUENTLY ASKED QUESTIONS

Q: How should we size a commercial energy storage system?

Start with interval load data (15-minute or hourly), the tariff structure (peak/off-peak rates, demand charges), planned solar capacity, required backup loads, and desired operating objective. The GCB-E100 reference configuration (50kW/100kWh) suits sites with peak demand around 40–60kW and 2–4 hours of storage duration. We validates sizing against your actual load profile and delivers a complete report within 2–3 business days.

Q: Can this system operate with solar and the grid simultaneously?

Yes. The GCB-E100 supports three operating modes: grid-tied (peak shaving, TOU arbitrage with utility-interactive controls), off-grid (islanded backup with seamless transfer), and hybrid (solar-plus-storage with grid-fallback). The applicable mode, protection coordination, and utility interconnection agreement must be confirmed for the actual project and local grid code. All modes are configurable to site — not locked to a single topology.

Q: What customization options are available for the GCB-E100?

The GCB-E100 is fully configurable to project requirements. Customization options subject to project volume include: cell capacity selection (280Ah or 314Ah LFP), AC output power configuration, cabinet color and OEM branding (logo + housing), integration with third-party inverters and EMS platforms, communication protocol (Modbus TCP/RTU, CAN, IEC 61850), and destination-market certification packages. Contact us with your project specification for a customized proposal.

Q: What should be verified before placing an order?

Confirm the final bill of materials, energy capacity, installation location (indoor/outdoor), environmental conditions (ambient temperature, humidity), electrical interface (AC voltage, phase, grid connection), fire-safety clearances per local code, required certificates for the destination market, delivery scope, and commissioning responsibilities. We provides a pre-order verification checklist and remote commissioning support via video call. On-site commissioning engineer available for projects above 500 kWh.